sato residence 2008.10.31

Clear VG heart beveled cedar siding with a clear stain is being installed. The carpenters are almost through installing siding on all exterior walls.  The siding has transformed the project thus making all parties involved excited to see that it is heading into the final stages. There is still a great deal of finish work to be done, but i was glad to see the Tyvek got covered. The travertine floor tiles are also being installed and judging from the installers’ work so far, I am looking forward to a very good looking master bedroom and the rest of the house.