sato residence 08.04.23 2008/04/28 All concrete slabs are poured and steel columns are erected. Wall framing has started. fins architecture llc
Sato Residence Construction Underway 2008/02/20 The Contractor, S+R Construction , has started construction on the Sato Residence almost two months ago. Forms are being set for footings and foundations.